1.American National Standards Institute/Electronic Industries Alliance (1998). ANSI-EIA-748-98, Earned Value Management Systems. Arlington, VA: Electronic Industries Alliance; USA, 1998
2.AminanFayek. (1998). Competitive Bidding Strategy Model and Software System for Bid Preparation.Jounal ofConstruction Engineering and Management.Chen, Jianguo. (2001). Project Measurement and cost management. Shanghai: Tongji University Press.
Vol. 5, No. 8 Asian Social Science 148
3.DonR.Hansen& Maryanne M. Mowen. (2005). Cost Management: Accounting and Control.
Dong, Shibo. (2003). Status Quo of Construction Cost Management Theory and Its Developmental Trend. ConstructionCost Management, (5).
4.EINSENHARDT Karen M. “Building Theories from Case Study Research”, Academy of Management Review, vol. 14, No. 4, pp. 532-550, 1989.
5.Feng, Jingchun. (2000). Study on Counter Measures of Project Cost Management. Technical and EconomicDevelopment, (6).
6.Gou, Zhiyuan. (2002). Thought on Integrated Control Approach of Construction Cost Management. Construction CostManagement, (6).
7.Hu, Jianming. (2002). Discussion on Construction Cost Estimation Consultant Participating in Whole Course of CostManagement.Construction Cost Management, (5).
8.Huang, Yonggen. (2004). Value Engineering and Its Application in Construction Cost Control.Construction Economics,(8).
9.JamesA.Bent& Kenneth King Humphreys. (1996). Effective Project Management through Applied Cost and ScheduleControl, Cost Engineering.
10.Kerzner, Harold, Project Management, A Systems Approach to Planning, Scheduling and Controlling, Harold Kerzner, 6ª Edição, Van Nostrand Reinhold, 1998.
11.Liu, Guiwen&Shen, Qiping. (2001). A Study of Value Engineering Applications in India’s Construction Industry.Value Engineering, (3).
12.Liu, Hongqing. (2003). About overall cost control. Shanxi Architecture, (29)6.
13.Ma, Guanghong&Xu, Wei. (2003). Discussion on Application of Overall Cost Management Theory.ProjectManagement, (4).
14.Norton B R &McElligot C W. (1995). Value management in construction: a practical guide. Hampshire: MacmillanPress.
15.PMI - Project Management Institute - Practice Standard for Earned Value Management http://www.pmi.org, access in November 15th, 2004.
16.Qin, Aiguo. (1999). Study on Construction Cost Management. Economic Tribune, (22).
17.Ren, Hong. (2004). Cost Planning and Control of Construction Project. India Higher Education Press.
18.SidneyM.Levy. (2002). Project Management in Construction.
19.Smith, Nigel J., Project Cost Estimating, Ed. Thomas Telford, London, UK
20.Stephen P Robbins & David A. Decenzo. (2002). Fundament of Management.Prentice Hall, Inc.
Asian Social Science August, 2009.
21.Takashi Ishikawa. (1996). Analogy by Abstraction: Case Retrieval and Adaptation for Inventive Design Expert Systems.Expert Systems with Application, (4)10.
22.Tao, Xueming, Huang, Yunde&Xiong, Wei. (2004). Construction Cost Valuation and Management.
23.Wang, Ailin. (2003). Value Engineering and Its Application in Constructional Engineering.Anhui Architecture, (5).
24.Wang, Li &Xu, Zihua. (2004). Comparative Study on Construction Cost Models at Home and Abroad. ArchitectureEconomics.
25.Wang, Zhenqiang. (2002). British Construction Cost Management. Tianjin: Nankai University Press.
Wang, Zhenqiang. (2002). Japanese Construction Cost Management. Tianjin: Nankai University Press.
26.Xiang, Ke&Luo, Feng. (2004). Cost Control of Design Stage. Sichuan Architecture, (2).
27.YIN, Robert.; Case Study Research and Design, SAGE Publications, Thousand Oaks, California, USA,1994
28.Zhong, Guangen. (2004). Brief Discussion on Cost Control System in Projects of Commonwealth Nations.
29.Zuo, Jin & Han, Hongyun. Actuality & Amelioration of Whole Life-cycle Value-chain in Architecture.Value Engineering, (6).