International Research journal of Management Science and Technology

  ISSN 2250 - 1959 (online) ISSN 2348 - 9367 (Print) New DOI : 10.32804/IRJMST

Impact Factor* - 6.2311


**Need Help in Content editing, Data Analysis.

Research Gateway

Adv For Editing Content

   No of Download : 51    Submit Your Rating     Cite This   Download        Certificate

RELIABILITY EVALUATION OF PREVENTIVE MAINTENANCE FOR A SCHEDULED REPLACEMENT

    4 Author(s):  CHETAN KUMAR SHARMA, KULDEEP MALIK,ASHOK KUMAR,R.K.SHARMA

Vol -  5, Issue- 1 ,         Page(s) : 516 - 519  (2014 ) DOI : https://doi.org/10.32804/IRJMST

Abstract

In this manuscript, we have to analyze the effect of successful repairs is equivalent to standby redundancy, preventive maintenance achieves its purpose by the regular case of normally operating subsystems, devices, and components that require total attention of the system. The maintenance is instantaneous, and equipment performance is concerned, if it is accomplished with the maintenance time constraint.

Balagurusamy E (2003) “Reliability Engineering” Tata Mc-Graw Hill Publishing Company Limited, New Delhi
Ashok Kumar, Madan Mohan Gupta& Chetan kumar sharma (2012): “Cost Analysis of 2-Units Electronic Parallel Redundant system for three states”.IRJMSH, Online ISSN 2277-9809, Vol. 3, Issue 1, pp 290-296

*Contents are provided by Authors of articles. Please contact us if you having any query.






Bank Details